Categorical Exclusion Determinations: B1.13

Existing Regulations

B1.13: Pathways, short access roads, and rail lines
Construction, acquisition, and relocation, consistent with applicable right-of-way conditions and approved land use or transportation improvement plans, of pedestrian walkways and trails, bicycle paths, small outdoor fitness areas, and short access roads and rail lines (such as branch and spur lines).

Previous Regulations

Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this categorical exclusion.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • August 22, 2011

    Wood Pole Replacement Along Portions of the Grand Coulee-Chief Joseph #1 and #2 230-Kilovolt Transmission Line
    CX(s) Applied: B1.3, B1.13
    Date: 08/22/2011
    Location(s): Douglas County, Washington
    Office(s): Bonneville Power Administration

  • August 22, 2011

    Wood Pole Replacement Along the Grand Coulee-Okanogan #2 115-Kilovolt Transmission Line
    CX(s) Applied: B1.3, B1.13
    Date: 08/22/2011
    Location(s): Grant County, Washington
    Office(s): Bonneville Power Administration

  • June 13, 2011

    705-C Gravel Road Extension
    CX(s) Applied: B1.13
    Date: 06/13/2011
    Location(s): Aiken, South Carolina
    Office(s): Environmental Management, Savannah River Operations Office

  • June 8, 2011

    Kennel Lights and Sidewalk

    Date: 06/08/2011
    Location(s): Aiken, South Carolina
    Office(s): Environmental Management, Savannah River Operations Office

  • May 5, 2011

    Stegall-Wayside 230 Kilovolt Access Road Extension
    CX(s) Applied: B1.13
    Date: 05/05/2011
    Location(s): Dawes County, Wyoming
    Office(s): Western Area Power Administration-Rocky Mountain Region

  • April 19, 2011

    Construction and Operation of a Cask Processing Enclosure (CPE) at the Transuranic (TRU) Waste Processing Center (TWPC) on the Oak Ridge Reservation, Lenoir City, Tennessee
    CX(s) Applied: B1.13, B3.1, B6.6
    Date: 04/19/2011
    Location(s): Lenoir City, Tennessee
    Office(s): Oak Ridge Office

  • April 19, 2011

    Construction and Operation of a Cask Processing Enclosure at the Transuranic Waste Processing Center on the Oak Ridge Reservation, Lenoir City, Tennessee
    CX(s) Applied: B1.13, B3.1, B6.6
    Date: 04/19/2011
    Location(s): Lenoir City, Tennessee
    Office(s): Environmental Management, Oak Ridge Office

  • March 23, 2011

    Sidewalks Repair at 704-23K and 701-12K
    CX(s) Applied: B1.13
    Date: 03/23/2011
    Location(s): Aiken, South Carolina
    Office(s): Environmental Management, Savannah River Operations Office

  • January 31, 2011

    Overpack Transfer Path Extension General Plant Project
    CX(s) Applied: B1.13
    Date: 01/31/2011
    Location(s): Idaho
    Offices(s): Naval Nuclear Propulsion Program

  • January 26, 2011

    K-Area Entrance Roadway Expansion
    CX(s) Applied: B1.13
    Date: 01/26/2011
    Location(s): Aiken, South Carolina
    Office(s): Environmental Management, Savannah River Operations Office

  • January 11, 2011

    South Compost Facility #2
    CX(s) Applied: B1.13, B1.30, B3.12, B6.1
    Date: 01/11/2011
    Location(s): Casper, Wyoming
    Office(s): RMOTC

  • December 2, 2010

    North Composting Facility
    CX(s) Applied: B1.13, B1.30, B3.12, B6.1
    Date: 12/02/2010
    Location(s): Casper, Wyoming
    Office(s): RMOTC

  • December 2, 2010

    South Composting Facility
    CX(s) Applied: B1.13, B1.30, B3.12, B6.1
    Date: 12/02/2010
    Location(s): Casper, Wyoming
    Office(s): RMOTC

  • December 2, 2010

    Concrete Storage Yard
    CX(s) Applied: B1.13, B1.30, B3.12, B6.1
    Date: 12/02/2010
    Location(s): Casper, Wyoming
    Office(s): RMOTC

  • November 1, 2010

    858 Limited Area Expansion
    CX(s) Applied: B1.11, B1.13
    Date: 11/01/2010
    Location(s): New Mexico
    Office(s): Sandia Site Office

  • October 26, 2010

    Taft-Hot Springs #1 Landing Construction, Access Road and Structure Maintenance
    CX(s) Applied: B1.3, B1.13
    Date: 10/26/2010
    Location(s): Thompson Falls, Montana
    Office(s): Bonneville Power Administration

  • July 9, 2010

    Bayview Gas to Energy Project
    CX(s) Applied: B1.13, B1.15, B1.24, A9, A11, B5.1
    Date: 07/09/2010
    Location(s): Elberta, Utah
    Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory

  • July 9, 2010

    DeKalb County/Metropolitan Atlanta Alternative Fuel and Advanced Technology Vehicle Project
    CX(s) Applied: B1.13, B1.15, A1, A9, A11, B5.1
    Date: 07/09/2010
    Location(s): Ellenwood, Georgia
    Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory

  • June 28, 2010

    Installation and Operation of the North Plateau Full Scale Permeable Treatment Wall
    CX(s) Applied: B1.6, B1.13, B6.1, B6.9
    Date: 06/28/2010
    Location(s): West Valley, New York
    Office(s): West Valley Demonstration Project

  • June 8, 2010

    Ross-Lexington Number 1 New Access Road Construction: 15/1 to 15/2
    CX(s) Applied: B1.13
    Date: 06/08/2010
    Location(s): Clark County, Washington
    Office(s): Bonneville Power Administration

  • June 1, 2010

    Culvert Cleanout - Olinda-Tracy 167-3
    CX(s) Applied: B1.3, B1.13
    Date: 06/01/2010
    Location(s): Solano County, California
    Office(s): Western Area Power Administration-Sierra Nevada Region

  • June 1, 2010

    Routine Maintenance Along TRY-CC 10/4-11/1
    CX(s) Applied: B1.3, B1.13
    Date: 06/01/2010
    Location(s): Contra Costa County, California
    Office(s): Western Area Power Administration-Sierra Nevada Region

  • June 1, 2010

    Culvert Cleanout - Olinda Tracy 167-3
    CX(s) Applied: B1.13, B1.3
    Date: 06/01/2010
    Location(s): Solano County, California
    Office(s): Western Area Power Administration-Sierra Nevada Region

  • June 1, 2010

    Routine Maintenance Along TRY-CC 10/4-11/1
    CX(s) Applied: B1.13, B1.3
    Date: 06/01/2010
    Location(s): Conta Costra County, California
    Office(s): Western Area Power Administration-Sierra Nevada Region

  • May 26, 2010

    Access Road Improvements for Rattlesnake-Garrison Number-1 and Garrison-Anaconda Number-11 Transmission Lines
    CX(s) Applied: B1.13, B1.3
    Date: 05/26/2010
    Location(s): Granite County, Montana
    Office(s): Bonneville Power Administration