Topic A: Western Interconnection-Level Analysis and Planning CX(s) Applied: A9, A11 Date: 04/20/2010 Location(s): Salt Lake City, Utah Office(s): Electricity Delivery and Energy Reliability, National Energy Technology Laboratory
Gale Center of History and Culture Lighting and Mechanical Retrofit CX(s) Applied: B2.2, B1.4, B5.1 Date: 04/16/2010 Location(s): South Jordan, Utah Office(s): Energy Efficiency and Renewable Energy
Local Energy Assurance Planning (LEAP) CX(s) Applied: A9 Date: 04/12/2010 Location(s): Herber, Utah Office(s): Electricity Delivery and Energy Reliability, National Energy Technology Laboratory
Maintenance and Vegetation Management Along Existing Western Area Power Administration Transmission Line Rights of Way on National Forest System Lands, Colorado, Utah, and Nebraska