Saguaro-Oracle Vegetation Removal CX(s) Applied: B1.3 Date: 04/07/2011 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region
Vegetation Removal and Access Road Maintenance along the existing Electrical District 2-Saguaro #2 115-kV transmission line CX(s) Applied: B1.3 Date: 03/21/2011 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region
Blythe-Knob CX(s) Applied: B1.3 Date: 03/21/2011 Location(s): Imperial County, California, Maricopa County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region
GreenFire Energy began work to demonstrate a process that would use CO2 to harness geothermal energy to make electricity. What is more, the technology has the potential to add carbon sequestration – not to mention reduced water consumption – to the benefits already associated with geothermal power.
Empire-Electrical District 5 Double Circuit Upgrade CX(s) Applied: B1.3 Date: 03/08/2011 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region
Casa Grande-Empire Double Circuit Upgrade and Structure Replacement CX(s) Applied: B1.3 Date: 03/08/2011 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region
Davis Dam Lower 230-kilovolt Substation Service Building Demolition CX(s) Applied: B1.23 Date: 03/03/2011 Location(s): Mohave County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region
Tucson-Apache Erosion Repair & Cactus Relocation CX(s) Applied: B1.3 Date: 02/23/2011 Location(s): Pima County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region