Mandatory Photovoltaic System Cost Estimate

Eligibility 
Utility
Savings Category 
Photovoltaics
Program Info
State 
Colorado
Program Type 
Line Extension Analysis
Provider 
Colorado Public Utilities Commission

At the request of a customer or a potential customer, Colorado electric utilities are required to conduct a cost comparison of a photovoltaic (PV) system to any proposed distribution line extension if the customer or potential customer provides the utility with load data (estimated monthly kilowatt-hour usage) requested by the utility to conduct the comparison, and if the customer's or potential customer's peak demand is estimated to be less than 25 kilowatts (kW). In performing the comparison analysis, the utility must consider line-extension distance, overhead/underground construction, terrain, other variable construction costs, and the probability of additions to the line extension during the life of the open extension period.

If the customer has a ratio of estimated monthly kilowatt-hour (kWh) usage to line extension mileage that is less than or equal to 1,000, then the utility must provide the comparison at no cost. If the ratio is greater than 1,000, then the customer who requests a cost comparison must pay for it.