You are here

DOE lead agency interim final and proposed rules - EEI comments 10-20-08.doc

Consolidated Comments of the Edison Electric Institute (“EEI”) on (1) DOE Interim Final Rule, RIN 1901‐AB18, 73 Fed. Reg. 54456 (Sept. 19, 2008) and (2) DOE Proposed Rule, RIN 1901‐AB18, 73 Fed. Reg. 54461 (Sept. 19, 2008).