Replace Sparge Piping at Bryan Mound Raw Water Intake Structure CX(s) Applied: B1.3 Date: 09/20/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Office of NEPA Policy and Compliance
September 20, 2012Replace Sparge Piping at Bryan Mound Raw Water Intake Structure
CX(s) Applied: B1.3
Date: 09/20/2012
Location(s): Texas
Offices(s): Strategic Petroleum Reserve Field Office
Subcontractor shall provide all labor, materials, tools, equipment, and supervision required to replace sparge piping at the Bryan Mound Raw Water Intake Structure (RWIS). Tasks include replacement in kind of three piping spools.