Recovery Act: Hydroelectric Facility Improvement Project - Replacement of Current Mechanical Seal System with Rope Packing System CX(s) Applied: B5.1 Date: 07/25/2012 Location(s): Arkansas Offices(s): Golden Field Office
Office of NEPA Policy and Compliance
July 25, 2012Recovery Act: Hydroelectric Facility Improvement Project - Replacement of Current Mechanical Seal System with Rope Packing System
CX(s) Applied: B5.1
Date: 07/25/2012
Location(s): Arkansas
Offices(s): Golden Field Office
This NEPA review is being conducted due to a change in scope from a previous proposed project activity by North Little Rock Electric Department (LRE). LRE is no longer proposing to install an intake cleaning system into their Murray Hydroelectric Lock and Dam #7 facilities.
CX(s) Applied: B5.1
Date: 07/25/2012
Location(s): Arkansas
Offices(s): Golden Field Office
This NEPA review is being conducted due to a change in scope from a previous proposed project activity by North Little Rock Electric Department (LRE). LRE is no longer proposing to install an intake cleaning system into their Murray Hydroelectric Lock and Dam #7 facilities.