2012 National Electric Transmission Congestion Study CX(s) Applied: A1, A9 Date: 12/23/2011 Location(s): CX: none Offices(s): Electricity Delivery and Energy Reliability
Office of NEPA Policy and Compliance
December 23, 20112012 National Electric Transmission Congestion Study
CX(s) Applied: A1, A9
Date: 12/23/2011
Location(s): CX: none
Offices(s): Electricity Delivery and Energy Reliability
The Energy Policy Act of 2005 (EPAct) added several new provisions to the Federal Power Act (FPA), including FPA section 216. FPA section 216(a) requires the Secretary of Energy to conduct a study of electric transmission congestion within one year from the date of enactment of EPAct and every three years thereafter. The 2012 congestion study will be conducted in consultation with affected States.
CX(s) Applied: A1, A9
Date: 12/23/2011
Location(s): CX: none
Offices(s): Electricity Delivery and Energy Reliability
The Energy Policy Act of 2005 (EPAct) added several new provisions to the Federal Power Act (FPA), including FPA section 216. FPA section 216(a) requires the Secretary of Energy to conduct a study of electric transmission congestion within one year from the date of enactment of EPAct and every three years thereafter. The 2012 congestion study will be conducted in consultation with affected States.