Danada Solar Energy and Lighting ProjectCX(s) Applied: B5.1Date: 05/27/2010Location(s): Wheaton, IllinoisOffice(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory
Office of NEPA Policy and Compliance
May 27, 2010CX(s) Applied: B5.1
Date: 05/27/2010
Location(s): Wheaton, Illinois
Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory
Installing a 20+ kilowatt solar array on existing building; installing a digital LED (light-emitting diode) kiosk to monitor solar power; and installing 16 LED lights in an existing parking lot.