CX-006884: Categorical Exclusion Determination

Replace Big Hill Raw Water Intake Structure Screen Wash PipingCX(s) Applied: B1.3Date: 09/22/2011Location(s): Big Hill, TexasOffice(s): Strategic Petroleum Reserve Field Office, Sandia Site Office

Office of NEPA Policy and Compliance

September 22, 2011
Estimated Read Time   min
Replace Big Hill Raw Water Intake Structure Screen Wash Piping
CX(s) Applied: B1.3
Date: 09/22/2011
Location(s): Big Hill, Texas
Office(s): Strategic Petroleum Reserve Field Office, Sandia Site Office

Subcontractor shall furnish all labor, tools, equipment, materials, consumables, services, insurance, transportation, storage and supervision required to replace the Big Hill Raw Water Intake Structure screen wash piping.