Transfer and Return of Low-Enriched Uranium Fuel Elements from Idaho National Laboratory to the Research Reactor in Vienna, Austria (DOE/EIS-0218F-SA-05 and DOE/EIS-0203-SA-05)
A document that DOE prepares in accordance with DOE NEPA regulations (10 CFR 1021.314(c)) to determine whether a supplemental or new EIS should be prepared pursuant to CEQ NEPA regulations (40 CFR 1502.9(c).
If you have any trouble finding a specific document, please contact AskNEPA@hq.doe.gov for assistance.
Documents Available for Download
-
May 11, 2012
-
March 5, 2012
Savannah River Site High-Level Waste Tank Closure, SC
-
February 8, 2012
Draft Tank Closure and Waste Management, Hanford Site, Richland, WA
-
January 25, 2012
Electric Drive Vehicle Battery and Component Manufacturing Initiative Application, Lancaster, OH
-
November 14, 2011
Transmission System Vegetation Management Program, Rivergate-Keeler No. 1
-
November 8, 2011
Transmission System Vegetation Management Program, Ross-St. Johns No. 1
-
November 3, 2011
Transmission System Vegetation Management Program, Carlton-Tillamook Transmission Line Corridor
-
September 27, 2011
Transmission System Vegetation Management Program, Kalispell-Kerr #1 Transmission Line Corridor
-
September 26, 2011
Transmission System Vegetation Management Program, Flathead-Hot Springs Transmission Line Corridor
-
August 15, 2011
Management of Spent Nuclear Fuel from the K Basins at the Hanford Site, Richland, Washington
-
August 15, 2011
Montana-Alberta Tie Ltd. 230-kV Transmission Line Project
-
August 4, 2011
Continued Operation of Lawrence Livermore National Laboratory
-
August 4, 2011
Continued Operation of Lawrence Livermore National Laboratory, CA
-
July 12, 2011
Abengoa Biorefinery Project, near Hugoton, Stevens County, Kansas
-
July 11, 2011
Reestablishing Long -Term Pulse Mode Testing Capability at the Annular Core Research Reactor, Sandia National Laboratories, New Mexico
-
July 8, 2011
Disposition of Surplus Highly Enriched Uranium
-
July 7, 2011
Treatment of Transuranic Waste at the Idaho National Laboratory, Carlsbad Field Office
-
April 1, 2011
Transport and Storage of High-Activity Sealed Sources From Uruguay and Other Locations
-
October 1, 2010
Continued Operation of the Pantex Plant and Associated Storage of Nuclear Weapon Components
-
September 1, 2010
Packaging and Handling of Remote-Handled Transuranic Waste in Shielded Containers, Carlsbad Field Office
-
July 20, 2010
Drilling, Testing, and Monitoring of up to 12 Temperature Gradient/Passive Seismic Geothermal Exploratory Wells Deschutes County, Oregon
-
July 20, 2010
Drilling, Testing, and Monitoring of up to 12 Temperature Gradient/Passive Seismic Geothermal Exploratory Wells Deschutes County, Oregon
-
July 1, 2010
Decommissioning of Eight Surplus Production Reactors at the Hanford Site, Richland, Washington, Richland Operations Office
-
October 5, 2009
Fish and Wildlife Implementation Plan
-
October 1, 2009
Continued Operation of Los Alamos National Laboratory, Los Alamos, New Mexico