Construction and Operation of Neutrinos at the Main Injector Off-Axis Electron Neutrino (νe) Appearance Experiment (NOvA) at the Fermi National Accelerator Laboratory, Batavia, Illinois, and St. Louis County, Minnesota
Environmental Assessments are concise public documents that a Federal agency prepares under NEPA to provide sufficient evidence and analysis to determine whether a proposed agency action would require preparation of an environmental impact statement or a finding of no significant impact.
If you have any trouble finding a specific document, please contact AskNEPA@hq.doe.gov for assistance.
DOCUMENTS AVAILABLE FOR DOWNLOAD
-
June 2, 2008
-
April 30, 2008
National Renewable Energy Laboratory's South Table Mountain Complex, Golden Field Office, National Renewable Energy Laboratory
-
April 21, 2008
Modernization of Facilities and Infrastructure for the Non-Nuclear Production Activities Conducted at the Kansas City Plant
-
April 1, 2008
Expansion of Permitted Land and Operations at the 9940 Complex and Thunder Range at Sandia National Laboratories, New Mexico
-
March 3, 2008
Demolition of Building 51 and the Bevatron at Lawrence Berkeley National Laboratory
-
February 4, 2008
Oak Ridge Science and Technology Project at the Oak Ridge National Laboratory, Oak Ridge, Tennessee
-
January 1, 2008
Proposed Construction and Operation of a Biosafety Level 3 Facility at Lawrence Livermore National Laboratory, Livermore, California
-
December 3, 2007
Blue Mountain Geothermal Development Project
-
November 1, 2007
10 CFR 433: Energy Efficiency Standards for New Federal Commercial and High-Rise Multi-Family Residential Buildings and 10 CFR 435: Energy Efficiency Standards for New Federal Residential Low-Rise Residential Buildings
-
November 1, 2007
Davis-Mead 230-kV Transmission Line Reconductor Project
-
October 1, 2007
Construction and Operation of a Proposed Ethanol Cellulosic Ethanol Plant, Range Fuels, Inc.
-
August 1, 2007
Y-12 Steam Plant Life Extenstion Project - Steam Plant Replacement Subproject
-
July 2, 2007
Three Site Development Projects at the National Renewable Energy Laboratory South Table Mountain Site, Colorado
-
July 2, 2007
Proposed Perched Groundwater Corrective Measures
-
July 2, 2007
Uranium Leasing Program
-
July 2, 2007
Adopted Energy Conservation Standards for Distribution Transformers, Office of Energy Efficiency & Renewable Energy
-
June 26, 2007
National Pollution Discharge Elimination System Stormwater Compliance Alternative at the Savannah River Site
-
May 1, 2007
Conveyance of Parcel ED-6 to the City of Oak Ridge, Tennessee
-
April 2, 2007
National Security Test Range
-
March 26, 2007
Proposed Decontamination and Demolition of Building 301 at Argonne National Laboratory
-
March 1, 2007
Proposed Consolidation and Expansion of Idaho National Laboratory Reseach and Development at a Science and Technology Campus
-
March 1, 2007
Proposed Conveyance of the American Musuem of Science and Energy and Associated Property Parcel G, and Parcel 279.01
-
March 1, 2007
U-233 Stabilization, and Building 3019 Complex Shutdown at the Oak Ridge National Laboratory Oak Ridge, Tennessee
-
January 1, 2007
Construction and Operation of a Physical Sciences Facility at the Pacific Northwest National Laboratory, Richland, Washington
-
January 1, 2007
Sacramento Municipal Utility District 230-kV Folsom Dam Transmission Line Relocation