This EIS was to analyze DOE's decision to approve a grid interconnection request by NextEra Energy Resources for its proposed 150-megawatt (MW) Crowned Ridge Wind Energy Center Project with the Western Area Power Administration's (WAPA's) existing Watertown Substation in Codington County, South Dakota. WAPA cancelled this EIS.