Summary

DOE/EIS-0268 evaluates the potential environmental impacts of the proposed shutdown of the River Water System at the Savannah River Site (SRS). The River Water System was originally constructed to pump large quantities of cooling water from the Savannah River to five nuclear reactors at SRS. Since all the reactors were shut down, no cooling water is needed.