The Bonneville Power Administration developed this SEIS to evaluate the environmental impacts of construction of a steel double-circuit 345-kilovolt transmission line from Moore Substation near Littleton, New Hampshire, to Comerford Substation near Monroe, New Hampshire and a 345-kilovolt wood pole transmission line from Comerford Substation to Webster Substation near Franklin, New Hampshire, as part of the Dickey-Lincoln School Lakes Transmission Project. The Final SEIS consists entirely of Section 9 (Consultation and Coordination), which incorporates public and agency comments on the Draft SEIS and responses to those comments, as well as all necessary errata and addenda to the Draft SEIS. This SEIS is a supplement to DOE/EIS-0008, Dickey-Lincoln School Lakes Transmission Project.