This EA evaluates the environmental impacts of a proposal by DOE’s Bonneville Power Administration to rebuild its existing Midway-Benton No.1 transmission line in place, or to reroute a portion of the Midway-Benton No. 1 transmission line that currently crosses Gable Mountain and Gable Butte in order to avoid crossing these features.

For more information, please see:

https://www.bpa.gov/efw/Analysis/NEPADocuments/Pages/Midway-Benton-Rebuild.aspx