You are here

EIS-0285-SA-62: Supplement Analysis

Transmission System Vegetation Management Program

Vegetation Management along the Rocky Reach – Maple Valley No. 1 Transmission Line Right of Way from structure 98/2 to structure 110/1. The transmission line is a 500 kilovolt line (April 2002).