Transmission System Vegetation Management Program
Vegetation Management along the Snohomish – Murray #1 from str 1\4 to str 18\5. The proposed work will be to remove both danger and reclaim trees outside and inside the right-of-way, respectively. Right-of-way width varies from 125 to 300 feet.