Transmission System Vegetation Management Program
Vegetation Management along the Chehalis-Mayfield No. 1 230 kV Transmission Line Right of Way and the Mossy Rock–Chehalis Transmission Line Right of Way, between 7/1 to 27/10. The proposed work will be accomplished in the indicated sections of the transmission line corridor with an average corridor width of 162 feet.