You are here

EIS-0285-SA-141: Supplement Analysis

Transmission System Vegetation Management Program

Vegetation Management for the Salem Albany #2 115 kV transmission line from Salem Substation to Albany Substation. BPA proposes to remove unwanted vegetation along the right-of-way, access roads, switch platforms, microwave beam paths, and around tower structures of the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA’s overall goal is to have low-growing plant communities along the rights-of-way to control the development of potentially threatening vegetation.