Transmission System Vegetation Management Program
Vegetation Management along the Elma-Cosmopolis #1 115kV transmission line corridor from structure 11/7 through structure 20/3. BPA proposes to remove unwanted vegetation along the right-of-way, access roads and around tower structures along the subject transmission line corridors. Approximately 8 miles of right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments.