You are here

EIS-0283-S2: Second Amended Notice of Intent

Surplus Plutonium Disposition Supplemental Environmental Impact Statement

The U.S. Department of Energy (DOE) announces its intent to modify the scope of the Surplus Plutonium Disposition Supplemental Environmental Impact Statement (SPD Supplemental EIS, DOE/EIS–0283–S2) and to conduct additional public scoping. DOE issued its Notice of Intent (NOI) to prepare the SPD Supplemental EIS on March 28, 2007, and issued an Amended NOI on July 19, 2010. DOE now intends to further revise the scope of the SPD Supplemental EIS primarily to add additional alternatives for the disassembly of pits (a nuclear weapons component) and the conversion of plutonium metal originating from pits to feed material for the Mixed Oxide (MOX) Fuel Fabrication Facility (MFFF), which DOE is constructing at the Savannah River Site (SRS) in South Carolina. Under the proposed new alternatives, DOE would expand or install the essential elements required to provide a pit disassembly and/or conversion capability at one or more of the following locations: Technical Area 55 (TA–55) at the Los Alamos National Laboratory (LANL) in New Mexico, H–Canyon/HB–Line at SRS, K–Area at SRS, and the MFFF at SRS. In addition, DOE has decided not to analyze an alternative, described in the 2010 Amended NOI, to construct a separate Plutonium Preparation (PuP) capability for non-pit plutonium because the necessary preparation activities are adequately encompassed within the other alternatives.