The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of the proposed Summit/Westward Project (“Project”) into the Federal Columbia River Transmission System (FCRTS) at BPA’s Allston Substation. The Project, which has been proposed by Westward Energy, LLC (Westward Energy), involves construction and operation of a 520-megawatt (MW) natural-gas-fired, combined-cycle generating facility. The facility will be located in Columbia County, Oregon, about 4.5 miles north of Clatskanie, Oregon. The decision to offer terms to interconnect the Project is consistent with BPA’s Business Plan Final Environmental Impact Statement (BP EIS) (DOE/EIS-0183, June 1995), and the Business Plan Record of Decision (BP ROD, August 1995). This decision thus is tiered to the Business Plan ROD.