EIS-0166: Record of Decision

Presidential Permit, PP-89, Bangor Hydro-Electric Company

Bangor Hydro applied to the DOE for a Presidential permit to construct a new electric transmission facility at the U.S. border with Canada. That action was determined to be ‘‘a major federal action, significantly affecting the quality of the human environment’’ within the meaning of NEPA. An EIS was issued on August 18, 1995, that considered the environmental impacts associated with granting or denying the Presidential permit. This ROD determined that allowing construction of the new electric facilities along alternative transmission line corridors and the options for alternative energy supplies discussed in the EIS did not prove preferable to granting the Presidential permit for construction along the proposed route.