Basin Electric Power Cooperative Culbertson Combustion Turbine Generator Project; Montana

Western Area Power Administration (WAPA) issued a finding of no significant impact for a proposal to construct and operate a 50 MW, gas-fired combustion turbine, connect it to WAPA’s transmission system, and interconnect it to WAPA’s transmission system by a new substation on the existing WAPA Williston to Wolf Point 230 kV transmission line.