EA-1596: Finding of No Significant Impact

Belfield to Rhame Transmission Line Project Stark, Slope, and Bowman Counties, North Dakota

Basin Electric Power Cooperative (Basin) has requested to interconnect their proposed new Belfield to Rhame 230-kilovolt (kV) transmission line and new Rhame Substation (Project) to the Western Area Power Administration's (Western) transmission system at Western's existing Belfield Substation.