Sacajawea Substation Expansion and Upgrade
CX(s) Applied: B4.6
Date: 41912
Location(s): Washington
Offices(s): Bonneville Power Administration
BPA is proposing to expand its existing Sacajawea Substation in order to add new electrical equipment that would control abnormally high power flows on the Ice Harbor No. 2 line.
CX(s) Applied: B4.6
Date: 41912
Location(s): Washington
Offices(s): Bonneville Power Administration
BPA is proposing to expand its existing Sacajawea Substation in order to add new electrical equipment that would control abnormally high power flows on the Ice Harbor No. 2 line.