Remove IT Equipment from Research Ridge Building 3
CX(s) Applied: B1.7
Date: 41879
Location(s): West Virginia
Offices(s): National Energy Technology Laboratory

Disconnect and remove copper and fiber cabling and associated cable cross connects and patch cabling from RR3 back to the T-40 pedestal.

Document(s) Available for Download