You are here

CX-011863: Categorical Exclusion Determination

Easts Ide Renovation Project Zone 1-Revision (T-1-11)
CX(s) Applied: B2.5, B5.2, B5.4, B5.5
Date: 03/13/2014
Location(s): Wyoming
Offices(s): RMOTC

This will consist of adding new 66, 100 ft of new 2' poly pipe !low lines to 52 wells in sections 2, 34 and 35. New manifolds will be built in 3 locations that will tie into the manifold at the East Side Tank. From there a main shipping line will be tied into the B-1-3 Shipping Facility.