CX-011861: Categorical Exclusion Determination

"Easts Ide Renovation Project Zone 1-Revision (T-1-11)
CX(s) Applied: B2.5, B5.2, B5.4, B5.5
Date: 03/13/2014
Location(s): Wyoming
Offices(s): RMOTC

This will consist of adding approximately 54,500 ft of new 2"" poly pipe flow lines to 46 wells In sections 11 and 14. New manifolds will be built In 5 locations; one manifold (the main manifold) will be constrvcted at T-1-11, the other 4 manifolds will be placed in various locations In zone 1. All manifolds will be into the T-1-11 manifold where the main shipping wdl then take fluids to 8-1-3. A new 400 barrel tank will be placed and utilized if needed at T-1-11."