You are here

CX-011839: Categorical Exclusion Determination

MiniBooNE Berme Repair
CX(s) Applied: B2.5
Date: 01/15/2014
Location(s): Illinois
Offices(s): Fermi Site Office

The MiniBooNE target station would be used for future experiments and as such needs to provide a reliable means of preventing groundwater infiltration. The purpose of this project is to repair a section of the MiniBooNE berm bay and enable conveyance of stormwater to Indian Creek, thus preventing the stormwater from infiltrating deeper into the ground at MiniBooNE and limiting the probability of the water becoming tritiated.