You are here

CX-011692: Categorical Exclusion Determination

Revenue Meter Installation at Wind River Biomass Facility
CX(s) Applied: B1.7
Date: 12/30/2013
Location(s): Washington
Offices(s): Bonneville Power Administration

Bonneville Power Administration (BPA) is proposing to install a revenue meter at Wind River Biomass Utility LLC's (Wind River) planned 4-megawatt woody biomass facility.