You are here

CX-011210: Categorical Exclusion Determination

Bridgeport-Gering 115-Kilovolt Transmission Line Structure Replacement
CX(s) Applied: B1.3
Date: 09/12/2013
Location(s): Nebraska, Nebraska
Offices(s): Western Area Power Administration-Rocky Mountain Region

Western Area Power Administration proposes to replace two rejected wood pole structures, 326 and 527, on its Bridgeport-Gering 115-kilovolt Transmission Line. Structure 326 is located in Morrill County. Structure 527 is located in Scottsbluff County.