You are here

CX-010846: Categorical Exclusion Determination

Install Stud, Shims, and Nut in the L-Basin 70-Ton Cask Lid Support Structure
CX(s) Applied: B2.5
Date: 07/30/2013
Location(s): South Carolina
Offices(s): Savannah River Operations Office

In the L-Area Disassembly Basin Transfer Bay, a new stud, shims, and nut will be installed on the anchor bolt on the southeast guide rail for the 70-Ton Cask Lid support structure. The activity will occur at the top anchor bolt which is located above the water surface.