You are here

CX-010719: Categorical Exclusion Determination

Grande Ronde-Boyer Ground Impairments
CX(s) Applied: B1.3
Date: 08/26/2013
Location(s): Oregon
Offices(s): Bonneville Power Administration

Bonneville Power Administration (BPA) proposes to fix two ground impairments between structures 4/5 and 4/6 on the Grand Ronde-Boyer No. 1 line. The impairments are required to be fixed within 30 days of detection due to concerns for public safety.