You are here

CX-010712: Categorical Exclusion Determination

Replace West Hackberry Brine Disposal System Header from MOV-51’s to WHT-14/15 Brine Tanks with HDPE Pipe
CX(s) Applied: B5.2
Date: 07/03/2013
Location(s): Louisiana
Offices(s): Strategic Petroleum Reserve Field Office

Subcontractor shall provide all labor, tools, materials, equipment and supervision required to replace the West Hackberry (WH) brine disposal system header from MOV-51’s to WHT-14/15 brine tanks with HDPE pipe.