CX-010429: Categorical Exclusion Determination

Harbour Pointe Small Generator Integration
CX(s) Applied: B1.7
Date: 06/25/2013
Location(s): Washington, Washington
Offices(s): Bonneville Power Administration

Bonneville Power Administration (BPA) proposes to integrate UniEnergy Technologies’ (UET) 1.5-megawatt battery generation project into BPA’s balancing authority (BA) in response to a UET small generator interconnection request.