Reduction of Uncertainty in Surfactant-Flooding Pilot Design using Multiple Single Well Tests CX(s) Applied: A9, A11, B3.1, B3.6, B3.7 Date: 04/18/2013 Location(s): Oklahoma Offices(s): National Energy Technology Laboratory
Office of NEPA Policy and Compliance
April 18, 2013Reduction of Uncertainty in Surfactant-Flooding Pilot Design using Multiple Single Well Tests
CX(s) Applied: A9, A11, B3.1, B3.6, B3.7
Date: 04/18/2013
Location(s): Oklahoma
Offices(s): National Energy Technology Laboratory
Conduct single well test of newly developed surfactant flooding pilot design.
CX(s) Applied: A9, A11, B3.1, B3.6, B3.7
Date: 04/18/2013
Location(s): Oklahoma
Offices(s): National Energy Technology Laboratory
Conduct single well test of newly developed surfactant flooding pilot design.