Slipstream Testing of a Membrane Carbon Dioxide Capture Process for Existing Coal-Fired Power Plant CX(s) Applied: A9, A11 Date: 04/25/2013 Location(s): Indiana Offices(s): National Energy Technology Laboratory
Office of NEPA Policy and Compliance
April 25, 2013Slipstream Testing of a Membrane Carbon Dioxide Capture Process for Existing Coal-Fired Power Plant
CX(s) Applied: A9, A11
Date: 04/25/2013
Location(s): Indiana
Offices(s): National Energy Technology Laboratory
Vectren Corporation will provide consulting services (BP2).
CX(s) Applied: A9, A11
Date: 04/25/2013
Location(s): Indiana
Offices(s): National Energy Technology Laboratory
Vectren Corporation will provide consulting services (BP2).