Demolition of Building 211 CX(s) Applied: B1.23 Date: 04/23/2013 Location(s): California Offices(s): Stanford Linear Accelerator Site Office
Office of NEPA Policy and Compliance
April 23, 2013Demolition of Building 211
CX(s) Applied: B1.23
Date: 04/23/2013
Location(s): California
Offices(s): Stanford Linear Accelerator Site Office
SLAC National Accelerator Laboratory proposes to demolish Building 211 located in the Research Yard. Building 211 is a 1,280 square foot mobile prefabricated steel frame modular building that is set on concrete blocks. The building was constructed in 1966.