Copper Mountain to Boysen 34.5 Kilovolt Transmission Line Structure Replacement CX(s) Applied: B1.3 Date: 01/11/2013 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region
Office of NEPA Policy and Compliance
January 11, 2013Copper Mountain to Boysen 34.5 Kilovolt Transmission Line Structure Replacement
CX(s) Applied: B1.3
Date: 01/11/2013
Location(s): Wyoming
Offices(s): Western Area Power Administration-Rocky Mountain Region
Western Area Power Administration (Western) proposes to replace 13 existing defective single wood pole structures along the Copper Mountain to Boysen 34.5 kilovolt Transmission Line.
CX(s) Applied: B1.3
Date: 01/11/2013
Location(s): Wyoming
Offices(s): Western Area Power Administration-Rocky Mountain Region
Western Area Power Administration (Western) proposes to replace 13 existing defective single wood pole structures along the Copper Mountain to Boysen 34.5 kilovolt Transmission Line.