You are here

CX-009792: Categorical Exclusion Determination

Video Inspection of Bryan Mound 36-inch Raw Water Pipeline
CX(s) Applied: B1.3
Date: 01/07/2013
Location(s): Texas
Offices(s): Strategic Petroleum Reserve Field Office

Subcontractor shall provide all supervision, labor, materials, tools, supplies, transportation, facilities, equipment, and services to perform the work in connection with the piping inspection and video analysis as required for the Bryan Mound 36-inch Raw Water pipeline from the RWIS pig receiver to the High Pressure Pump Pad pig launcher.