CX-009714: Categorical Exclusion Determination

Install Temperature Monitoring on Big Hill 36 inch Crude Oil Pipeline CX(s) Applied: B5.2 Date: 11/26/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office

Office of NEPA Policy and Compliance

November 26, 2012
Estimated Read Time   min
Install Temperature Monitoring on Big Hill 36 inch Crude Oil Pipeline
CX(s) Applied: B5.2
Date: 11/26/2012
Location(s): Texas
Offices(s): Strategic Petroleum Reserve Field Office

Subcontractor shall provide all labor, materials, tools, equipment, and supervision required to install temperature monitoring instrumentation on the Big Hill (BH) 36 inch crude oil pipeline at valve stations 8PL00-MOV-02, 8PL00-MOV-04, 8PL00-MOV-05, and 8PL00-MOV-15. Tasks include installation of thermocouples, transmitters, and cables.