723-A Distribution Panel 4 (DB4) Replacement CX(s) Applied: B1.3 Date: 12/19/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
December 19, 2012723-A Distribution Panel 4 (DB4) Replacement
CX(s) Applied: B1.3
Date: 12/19/2012
Location(s): South Carolina
Offices(s): Savannah River Operations Office
The purpose of this work is to replace obsolete Distribution Panel DP4 with new distribution panel in 723-A and add fused disconnect switch to provide a lockout point between substation 752-17A and the distribution panel.