Alternate Source of Firewater at Bryan Mound CX(s) Applied: B5.2 Date: 11/05/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Office of NEPA Policy and Compliance
November 5, 2012Alternate Source of Firewater at Bryan Mound
CX(s) Applied: B5.2
Date: 11/05/2012
Location(s): Texas
Offices(s): Strategic Petroleum Reserve Field Office
Subcontractor shall provide all transportation, materials, equipment, supplies, tools, facilities, labor and supervision required to supplement the Bryan Mound site firewater from an alternate source when the Bryan Mound raw water intake is out of service for repair.
CX(s) Applied: B5.2
Date: 11/05/2012
Location(s): Texas
Offices(s): Strategic Petroleum Reserve Field Office
Subcontractor shall provide all transportation, materials, equipment, supplies, tools, facilities, labor and supervision required to supplement the Bryan Mound site firewater from an alternate source when the Bryan Mound raw water intake is out of service for repair.