CX-009510: Categorical Exclusion Determination

Strategic Petroleum Reserve Emergency Pipeline and Piping Repair, 2013-2017 CX(s) Applied: B5.4 Date: 10/30/2012 Location(s): CX: none Offices(s): Strategic Petroleum Reserve Field Office

Office of NEPA Policy and Compliance

October 30, 2012
Estimated Read Time   min
Strategic Petroleum Reserve Emergency Pipeline and Piping Repair, 2013-2017
CX(s) Applied: B5.4
Date: 10/30/2012
Location(s): CX: none
Offices(s): Strategic Petroleum Reserve Field Office

Subcontractor shall provide all transportation, materials, equipment, supplies, labor and supervision required to perform emergency repairs on the Strategic Petroleum Reserve system site piping (including underground fire protection systems and offsite pipelines).