Building 922 Ice Melt/Heat Trace Project CX(s) Applied: B1.3 Date: 09/20/2012 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Office of NEPA Policy and Compliance
September 20, 2012Building 922 Ice Melt/Heat Trace Project
CX(s) Applied: B1.3
Date: 09/20/2012
Location(s): Pennsylvania
Offices(s): National Energy Technology Laboratory
Installation of heat trace in the east gutters and downspouts of Building 922 to prevent ice and water damage during the winter.
CX(s) Applied: B1.3
Date: 09/20/2012
Location(s): Pennsylvania
Offices(s): National Energy Technology Laboratory
Installation of heat trace in the east gutters and downspouts of Building 922 to prevent ice and water damage during the winter.