CX-009221: Categorical Exclusion Determination

Rerouting of Power Lines at 100-D Reactor in Support of Site Remediation CX(s) Applied: B4.13 Date: 09/24/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office

Office of NEPA Policy and Compliance

September 24, 2012
Estimated Read Time   min
Rerouting of Power Lines at 100-D Reactor in Support of Site Remediation
CX(s) Applied: B4.13
Date: 09/24/2012
Location(s): Washington
Offices(s): River Protection-Richland Operations Office

Proposed action will remove/reroute small sections of existing 230-kV/13.8-kV aerial electrical power lines at 100-D Reactor to support remedial action excavation operations.