Wind Tower Cathodic Protection CX(s) Applied: B1.19 Date: 08/14/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
August 14, 2012Wind Tower Cathodic Protection
CX(s) Applied: B1.19
Date: 08/14/2012
Location(s): South Carolina
Offices(s): Savannah River Operations Office
Cathodic protection will be installed to the anchors of wind towers 614-20G, 614-21G, 614-22G, 614-23G, 614-24G, 614-25G, 614-26G, 614-47G, and 623-26N; anodes and conductors will be attached to each of the three anchors at each tower.