284-H Track Coal Hopper Pit Modifications
CX(s) Applied: B1.28
Date: 08/29/2012
Location(s): South Carolina
Offices(s): Savannah River Operations Office
The out-of-service 284-H Track Coal Hopper will be modified to alleviate stormwater collection in the Coal Hopper Sumps. The hoppers will be filled with grout to prevent the accumulation of water in the sump.